Sunday 22 November 2009

3 Cracks ;-0


With the Airframe now unfettered by the engine not one but Three Cracks are visable, quite a find. I dont know how I feel about this, but will chat about the fixes with PM Aviation. However we are almost finished with the dissembly, and so can start with the repairds. Only tasks left are the removal of the suspention wishbones and wheels so that included the removal of the brakes, then its off to the welders and poweder coaters!



No comments:

Post a Comment